3D Modelling of Qi Zhong stadium

Tennis Stadium

Sweden
Created on 2019.06.03 762 views
75
ABOUT
PROJECT TIMELINE
Stadium was designed using reference elements. Inner seating stands and all the seats in the stadium is Power copy instantiated with reference to axis system. Seating capacity has been parameterized and can be increased till 65 rows. All the remaining modules of the stadium like outer columns, beams and Roof change their height and position according to the number of increased rows in a defined ratio. The position of the Roof is controlled by a ratio parameter and can be opened or closed which is the highlight of our project.
Discover the team
Who’s behind this project
AN Adarsh Nataraj
Discover the solution
Software used for this project
75
Project Timeline
Project Timeline