DBT Project

Design, Build and Test Project

Netherlands
Created on 2020.06.10 377 views
34
ABOUT
PROJECT TIMELINE
In the Design, Build and Test Project I was part of team Inov8. We had to build an aircraft which was going to perform a flying race in terms of weight lifting. The model that would lift the most without crashing would be the winner. Unfortunately, due to Corona the real flying race got cancelled, so was the design building process. However, the model design in CATIA got prioritized since the race was going to take place in a virtual environment. I was the work package manager of CATIA designing. Together with my colleagues we managed to successfully design our aircraft, The Interconnector and compete in the virtual race where we managed to if a total weight of 3kg. The Interconnector model is the project I would like to show in this competition. Go team Inov8!