SD
Stefan Dirnberger

PROJECT TIMELINE
In the 4th grade of our higher technical college BULME Deutschlandsberg we decided to create a hydraulic lift system. Our system is different to others in terms of the portability. You can mount rolls on the connection pieces and move the lift system around. The system can lift cars up to 3 tons and reach up to 2 meters of height.
Apart from the construction part, we also planned und calculated the realising the project.
We can say that we learned many important things due to this project. The most important thing we learned was how important it is to construct the whole product correctly and use a proper structure through the whole project.
Discover the team
Who’s behind this project
Discover the solution
Software used for this project
Check my new project