X-Treme 4X4- (APSSDC)

X-Treme 4X4

India
Created on 2020.06.16 58 views
3
ABOUT
PROJECT TIMELINE
    Developing the X-Treme 4X4 vehicle Model to changes the entire whole product in the Manufacturing and Assembly Station. It gives a solution for the planning process and product flow gives the Workload balancing, 4D planning, and System Gantt Chart provides clear information about Different operations and performed in real lime manufacturing and we can analyze and done by Time Motion Study for the Overall Plant.
Discover the team
Who’s behind this project
mv mahesh virkal
Discover the solution
Software used for this project
3
Project Timeline
Project Timeline